ninja-forms
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/reliserv/public_html/dsgenterprisesltd/wp-includes/functions.php on line 6114hustle
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/reliserv/public_html/dsgenterprisesltd/wp-includes/functions.php on line 6114Arteche BF-3R lockout relay : Intended for trip and lockout applications where high demanding requirements in operating time and breaking capacity are needed.<\/p>\n
Contacts configuration<\/strong><\/td>\n3 Changeover \/ 3PDT Form-C<\/td>\n<\/tr>\n | General standards<\/strong><\/td>\n | IEC 61000, IEC 60947, IEC 60255 and ANSI C37.90<\/td>\n<\/tr>\n | Burden configuration<\/strong><\/td>\n | ESI 48-4 EB1: 1983 Low Burden<\/td>\n<\/tr>\n | Sockets<\/strong><\/td>\n | F type sockets \/ F large sockets for flush mounting sockets<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n | <\/p>\n Arteches\u2019 trip and lockout relays (LOR – ANSI 86) are heavy duty latching relays specially designed to perform as a\u00a0trip and lockout relay in most demanding applications.<\/strong>\u00a0Arteche LOR relays provides a high speed and safe power equipment operation.<\/p>\n After a trip, our LOR relays hold out for a reset<\/strong>\u00a0(hand or electrical reset) before allow any other trip command,\u00a0protecting critical power equipment<\/strong>\u00a0like circuit breakers, power transformers or generators against being energized\u00a0under faulty conditions<\/strong>\u00a0(gas pressure, oil level, temperature, partial discharges and other electrical alarms and equipment status signals).<\/p>\n With high breaking capacity and a guaranteed performance over a long life cycle, Arteche LOR relays are widely used where equipment\u00a0protection and error-free operation<\/strong>\u00a0is a must under the demanding conditions of a high voltage substation environment.<\/p>\n Arteche manufactures trip and lockout relays with a wide range of options to met each application requirements.\u00a0Reliability an performance by default for safety-critical and most demanding applications in power system environments<\/strong>\u00a0like HV breaker operation or control and command circuits in high voltage substations \/ bulk generation power plants \/ HV power system control.<\/p>\n With a\u00a0fast operation time\u00a0<\/strong>(between 3 and 20 ms. depending on the model), high breaking capacity and a wide range of auxiliary voltages, Arteche trip an lockout relays can be manufactured with a\u00a0high burden configuration, complying with ESI 48-4 international standard, as EB2 class relays<\/strong>, to avoid unwanted trip operations due to pickup or transients, particularly if the relay operating coil is connected to long wiring.<\/p>\n With more than 60 years\u2019 experience manufacturing high quality electromechanical relays (EM relays), ARTECHE is a worldwide reference for critical and safety applications. Our offering includes a\u00a0complete range of auxiliary, trip, lockout and contactor relays<\/strong>\u00a0specially designed for the most demanding environments. Millions of Arteche power relays are in service worldwide.<\/p>\n Arteche plug in power relays are designed to provide high breaking capacity, high dielectric strength (galvanic isolation), high speed operating time and are able to withstand vibrations and seismic conditions. With a wide range of voltages, options and accessories, Arteche relays perfect fit each application requirement, guaranteeing\u00a0a reliable performance during a long product lifecycle<\/strong>, also under severe environmental conditions.<\/p>\n |